K/ KESTRELPRECISION / COVENTRYPrepare an RFQ ↗

CONTRACT MANUFACTURING / TECHNICAL DEMONSTRATOR

Five microns.
Repeatably.
At volume.

Precision CNC machining & fabrication.
From the first prototype to the next production run.

Fictional Coventry shop. Tolerances, machinery and lead times below are sample brief specifications, subject to engineering review. No certified production capability is asserted.

CNC / 3–5 AXISEDM / GRINDINGPROTOTYPE → PRODUCTION
Original dimensioned axonometric illustration of a machined aluminium bracket
PART STUDY / KP–A204 / ILLUSTRATIVE, NOT A PRODUCTION DRAWING
UNITS / MMREV / CONCEPT

01 / CAPABILITY MATRIX

What we cut.
What we cut it in.

Select a cell for sample process limits.
All entries are illustrative, not confirmed production offers.

● Standard sample○ On request— Not offered in sample

Select a process/material combination to inspect its sample specification.
±0.005mm

SAMPLE MACHINING TARGET

1200 × 600

× 500MM NOMINAL PROCESS ENVELOPE

14

EQUIPMENT ENTRIES IN BRIEF

9days

ILLUSTRATIVE LEAD TIME, NOT A COMMITMENT

02 / PROCESSES

Geometry. Material. Method.

01 / MILL

CNC Milling

3, 4 and 5-axis. Nominal process envelope 1200 × 600 × 500mm. Simultaneous 5-axis subject to geometry and setup.

02 / TURN

CNC Turning

Up to Ø350mm × 900mm between centres. Live tooling and sub-spindle options in the sample list.

03 / EDM

Wire EDM

400 × 300 × 250mm. Sample positional target ±0.003mm for suitable conductive materials and profiles.

04 / GRIND

Surface Grinding

600 × 300mm table. Sample Ra 0.2 finish target; flatness and inspection criteria require agreement.

05 / FABRICATE

Sheet Fabrication

Laser to 12mm mild steel. Press brake to 3m. TIG/MIG requirements and qualifications require verification.

06 / ASSEMBLE

Assembly & Sub-assembly

Kitting, mechanical assembly, helicoil insertion and packing to an agreed customer specification.

03 / QUALITY & DOCUMENTATION

Inspection isn’t
an afterthought.

Define what needs proving before a part is made. Inspection scope, material traceability and first article documentation belong in the enquiry, not in a follow-up.

No certificates, audit records, ITAR registration or UKAS calibration have been verified for this fictional business. Certificate numbers from the brief are not displayed as credentials.

Certification scope in the original brief

ISO 9001:2015 and AS9100 Rev D, with a stated March 2026 audit, are fictional brief content only. Obtain current certificates, scope and issuer verification from a real supplier.

Illustrative inspection equipment

Zeiss Contura G2 CMM, 700 × 1000 × 600mm; Mitutoyo Crysta-Apex S574; Keyence IM-8000 optical measurement. Availability and calibration are unverified.

First article & traceability requirements

The brief proposes AS9102 First Article Inspection Reports for new part numbers. Agree revision, sampling, traceability, reporting and any charges in the actual order. No report is supplied by this demo.

04 / SECTOR CONSTRAINTS

Aerospace

Flowdown requirements. Material traceability. Document control.

Medical devices

Process validation. Packing requirements. Controlled changes.

Motorsport

Drawing revisions. Realistic deadlines. Clear priority planning.

Industrial automation

Repeat batches. Call-off schedules. Consistent inspection.

One part.
Or ten thousand.

Setup can dominate the cost of small batches. The brief covers one-off prototypes through 10,000 parts; ask for quantity breaks to compare options. No automated price or production capacity is promised here.

05 / EQUIPMENT REGISTER

The machine list.

All 14 entries are sample brief data. Machine travel is not a guaranteed part envelope; fixtures, tooling and geometry reduce usable capacity.

06 / A USEFUL FIRST ENQUIRY

Give us the detail.
We’ll start there.

  1. Drawings. STEP, IGES, DXF, PDF, SolidWorks or Fusion. Use a harmless test file here.
  2. Quantity & material. Include critical features and inspection requirements.
  3. Engineering review. The proposed response target is 24 hours for standard enquiries; complex assemblies 2–3 days. Neither is a live service promise.

Local planner only. Files are not read or uploaded; only the filename and size are inspected. No NDA, confidentiality protection, quote or supplier relationship is established. Use no confidential drawings.

No quote request will be sent.
PREPARE A LOCAL RFQ ↗