HALSTEAD■CONSTRUCTION
Original architectural illustration of a steel frame and tower crane at dusk

DENVER, CO · GENERAL CONTRACTOR · SINCE 1988

WE BUILD IT
RIGHT THE
FIRST TIME.

Commercial, industrial, and multifamily construction across the Front Range. Self-performed concrete and steel. In-house project management. A schedule we actually hold.

EMR 0.68LEED ACCREDITED$120M BONDING CAPACITY38 YEARS
$1.4BBUILT TO DATE
310PROJECTS DELIVERED
0.68EMR SAFETY RATING
92%REPEAT CLIENTS

WHAT WE BUILD

HEAVY LIFTING.
CLEAR THINKING.

From the first feasibility study
to the last warranty walk.

01 / PLAN

Preconstruction

Budgeting, constructability review and value engineering before a shovel moves. Decisions here protect the job in the field.

02 / BUILD

General Contracting

Hard-bid and negotiated work, with our own superintendents on every site. We don’t subcontract supervision.

03 / INTEGRATE

Design-Build

One contract with our architecture and engineering partners. One schedule and one point of accountability.

04 / MANAGE

Construction Management

CM at-risk and agency CM. Transparency into every buyout, milestone and change order.

05 / SELF-PERFORM

Concrete & Steel

Foundations, slabs, tilt-up and structural steel by our own crews. How we hold schedule when trades are tight.

06 / TRANSFORM

Tenant Improvement

Occupied-space buildouts on nights and weekends. Phasing that keeps your tenants operating.

SELECTED WORK

THE WORK
SPEAKS.

Six project studies from the portfolio.
Metrics and credentials are brief-supplied examples.

Showing six selected studies from 310 brief-reported projects. Discuss a similar build ↗

HOW A JOB RUNS

FROM BID
TO KEYS.

No mystery. No disappearing acts.
Open each phase to see what happens next.

01 BID & AWARD 2–6 WEEKS

We review documents, walk the site, and price it honestly. If budget and drawings disagree, you hear before award.

02 PRECONSTRUCTION 4–10 WEEKS

Constructability, long-lead procurement, permit strategy and a schedule built backwards from occupancy.

03 MOBILISATION 1–2 WEEKS

Site logistics, safety planning and temporary utilities. Your superintendent stays from day one to closeout.

04 CONSTRUCTION VARIES BY SCOPE

Weekly owner-architect-contractor meetings, a live schedule and change orders priced within five business days.

05 CLOSEOUT 3–5 WEEKS

Punch list, commissioning, as-builts, O&M manuals and facilities-team training before keys change hands.

06 WARRANTY 12 MONTHS MINIMUM

A one-year warranty walk at month eleven. A phone number that still works at month thirteen.

SAFETY IS HOW WE WORK

AN EMR OF 0.68
IS NOT AN
ACCIDENT.

Every superintendent holds OSHA 30. Every crew starts with a documented, task-specific hazard analysis. We stop work for conditions others would push through. That’s a trade we keep making.

0 lost-time incidents in 2025100% supervisors OSHA 30 certifiedDAILY documented pre-task planning

WHO RUNS THE JOB

BOOTS ON THE GROUND.

RH

RAY HALSTEAD

Founder & CEO · 38 years

DO

DENISE OKONKWO

President · 21 years

MV

MARTY VELASQUEZ

VP, Field Operations · 26 years

SK

SAM KLEIN

VP, Preconstruction · 14 years

REPEAT CLIENTS / AS DESCRIBED IN THE BRIEF

Baxter Cold Chain · Front Range Technical College · Cherry Creek Health · Anders Development · Union Station Partners · Meridian Industrial REIT

AGC MEMBER / ABC MEMBER / OSHA 30 / LEED AP ON STAFF

LET’S SEE WHAT YOU’RE BUILDING

GOT PLANS?
SEND THEM OVER.

A scope narrative or a napkin sketch. We’ll tell you whether we’re the right contractor — including when the answer is no.

(303) 555-0126 ↗

This demo prepares a local enquiry summary. Files and personal details are not uploaded or sent.

No bid, price or schedule is guaranteed by this preview.

Plan a similar project ↗